top of page

Warehouse Office Design: Layout, Rules and Costs in Australia

Writer: Andrew Lynch
Andrew Lynch
6d
9 min read

Warehouse office enclosure inside a Brisbane industrial shed

A good warehouse office is designed as a small building inside a bigger one. It needs its own acoustic envelope, its own lighting and air, a compliant way in and out, and a classification that suits the way it sits in the shed. Get those right at the design stage and the approval and build run smoothly. Leave them to the fitout stage and you pay for changes. At Formardå, a Brisbane building design studio led by licensed designer Andrew Lynch, commercial fit out design starts with exactly these questions.



TL;DR

 

  • An office that takes up no more than 10% of its storey’s floor area can usually share the warehouse’s classification. Above that, it is classified separately as Class 5, which changes the fire and access requirements.

  • Plan the office as three zones (amenities and meeting rooms, circulation and storage, workstations) and allow at least 6 m² per person for the workstation area.

  • Forklift and dock noise is the main design problem. Walls, ceiling, glazing, doors and air handling all have to work together.

  • Office and amenities space in an Australian warehouse fitout is commonly priced at $1,200 to $2,000 per m², against $150 to $400 per m² for the warehouse floor.

  • A mezzanine office needs structural certification, compliant stairs and balustrades, and a building permit or approval before work starts.

 

Table of Contents

 

 

What a warehouse office is and why businesses build one

 

A warehouse office is a workspace built inside an industrial shed, either on the ground or on a mezzanine (a raised platform within the building). Businesses build one to keep administration, sales, accounts or design staff on site, close to stock and dispatch, without sitting in the noise, dust and traffic of the floor. Hospitality and food businesses often add one beside a production or storage area. Others fold a showroom, meeting room or function space into the same footprint.

 

The brief usually has three parts: a quiet, clean working environment, a presentable entry for visitors and clients, and a layout that lets managers see the floor. How you balance those decides everything from where the office sits to how it is built.

 

Where the office sits: classification comes first

 

Under the National Construction Code (NCC), every building or part of a building has a class. Warehouses are typically Class 7b and offices Class 5. A part used for a different purpose that is no more than 10% of its storey’s floor area may, subject to limitations, adopt the main classification. The NSW Government’s NCC classification guide gives the example: an office taking up 8% of a warehouse floor can remain part of a Class 7b building, while one taking up 12% must be classified separately as Class 5.

 

That 10% line shapes your design. A 1,000 m² shed can hold a 100 m² office within the threshold. Push to 150 m² and you are designing a Class 5 area with its own requirements. Because the rule works on each storey, a mezzanine needs to be checked against the storey it sits in.


Office floor area and warehouse classification threshold

Size also affects fire design. The ABCB’s performance-based design case study describes a 17,225 m² warehouse with a 525 m² two-storey administration wing, and shows how very large fire compartments attract extra fire safety requirements and sometimes performance solutions for travel distance and smoke management. The same material recommends involving the warehouse manager in those discussions, because their knowledge of forklift traffic, racking and truck movements is the best guide to a workable outcome. Good office design asks that question early too.

 

Layout: zoning the office and separating it from the floor

 

WorkSafe Victoria’s office layout guidance suggests dividing office space into three types:

 

  • Primary space: amenities and meeting rooms.

  • Secondary space: corridors and storage.

  • Tertiary space: workstations.

 

It suggests a minimum of 6 m² per person for tertiary space, and says design considerations should be taken into account early, not only when outfitting. Although it is a Victorian publication, the principle is a sound planning yardstick anywhere in Australia.

 

A worked example

 

Take a team of 12 in a 100 m² office. Workstations at 6 m² each need 72 m². That leaves 28 m² for a meeting room, kitchenette, toilets, corridor and storage. It is tight, and it shows why the headcount must be settled before the office size, and why the 10% rule and the headcount have to be solved together.

 

Practical layout moves

 

  • Put the entry on the quiet side. Visitors and staff should reach the office without crossing forklift routes.

  • Put meeting rooms and break areas away from workstations. WorkSafe Victoria’s workplace facilities compliance code lists this among the ways to minimise noise, alongside flooring choices, quiet areas and sound-proof booths.

  • Keep clear movement space. The ACT’s Work Environment and Facilities Code of Practice says layouts should leave clear space between furniture and fixtures so people can move freely and evacuate quickly, and should balance privacy with visibility.

  • Give the floor a window. A glazed wall or internal window towards the warehouse lets supervisors see operations. Glazing is also where noise leaks, so specify it carefully.

 

Noise: the problem that decides the build

 

The WorkSafe Victoria code says that if employees are exposed to noise above the exposure standard in the OHS Regulations, the workplace is too noisy and a noise assessment must be done. Even below the standard, employers should minimise environmental noise. For a warehouse office, that means treating the office as an acoustic enclosure.

 

The elements that matter are:

 

  1. Walls and ceiling. The office envelope needs a rating suited to the noise outside. Mass and sealing matter more than thickness alone.

  2. Doors and glazing. Solid-core doors and double glazing keep the noise out. The weakest element sets the performance of the whole wall.

  3. Junctions. Gaps at the slab, the roof and the penetrations let noise straight through a well-built wall.

  4. Floors. The ACT code prefers carpet in office areas to reduce noise, reflected light and slip risk.

  5. Air handling. Separate air-conditioning for the office keeps dust and fumes from the floor out and avoids a noise path through shared ducts.

 

A designer who understands both the drawings and how a building is put together will detail these junctions on the plans, so the builder prices them from the start instead of discovering them on site.

 

Lighting and ventilation

 

The ACT code, drawing on AS/NZS 1680.1:2006, recommends these illuminance levels:

 

Task

Recommended lux

Simple tasks (waiting rooms, canteens, loading bays)

160

Ordinary tasks, including computer use

240

Routine office tasks (reading, writing, typing)

320 to 400

Difficult tasks (drawing boards, proofreading)

600

The difference matters. A warehouse lit for loading bays at 160 lux will be too dim for desks. The office needs its own lighting layout, and the design should use daylight where the shed allows it, with glare controlled on screens.

 

On ventilation, the same code requires fresh outside air, through natural openings of at least 5% of floor area or through air-conditioning. A sealed, acoustically rated box with no windows to the outside needs mechanical ventilation, which is another reason to plan services before the walls.

 

Access and amenities

 

If the public, clients or staff with a disability will use the office, access must be designed in. An NSW access assessment report for a warehouse, laboratory and office development shows what that looks like in practice: a continuous accessible path from the property boundary to the office entry, door clearances to AS1428.1, a passenger lift where a mezzanine is involved, a second handrail on stairs and an accessible unisex toilet. The report also notes that the warehouse portion itself may be exempt where access would pose a health or safety risk, and that the Disability Discrimination Act applies nationally.

 

Amenities follow the number of people. Egress widths and toilet counts depend on the building population, so state the headcount on the plans from the start.

 

Mezzanine or ground-level office

 

A mezzanine frees floor space for stock, which matters when every pallet position pays rent. A ground-level office is simpler and cheaper per square metre, but takes up floor area.

 

If you go up, the requirements are real. A fitout guide from Perth Markets states that mezzanines must comply with the NCC and relevant Australian Standards, with structural certification, a fire rating for office or frequent access, compliant stairs, handrails, guardrails and anti-slip surfaces, and a building permit. It also specifies non-load-bearing insulated panels that meet the NCC. These are one landlord’s tenant rules, but they line up with what any certifier will ask for.


Warehouse mezzanine office with stairs and guardrails

Merri-bek City Council’s classification fact sheet adds that an extra storey inside an existing warehouse can have compliance implications even without increasing the overall height.

 

What it costs

 

Costs vary with size, structure and finish. Going Rate’s Australian warehouse fitout data, reviewed in November 2026, puts the office and amenities portion at $1,200 to $2,000 per m². The warehouse floor itself (paint, line marking, lighting, basic power, minor works) runs $150 to $400 per m². On that data, a 1,000 m² unit with a 100 m² office commonly costs $250,000 to $450,000 all up, with most of the spend in the 10% that is office.

 

Two things follow from that:

 

  • Office area is where design saves money. A tight, well-zoned plan that avoids wasted corridor and oversized rooms reduces the most expensive square metres.

  • Late changes cost the most. Reworking services or acoustic details after the slab and frame are in is dearer than drawing them correctly once.

 

These are published market ranges for planning. A firm price comes from documented drawings and quotes.

 

Approvals: what to check before work begins

 

The path depends on the building, the zone and the work. Some points apply almost everywhere:

 

  1. Check the approved use. Merri-bek’s fact sheet says changing a building’s use needs a building permit, and that for office use a permit is required where building work is proposed and the approved use already permits Class 5. Rules differ by state and council, so confirm yours with the certifier.

  2. Check whether planning approval is needed. In NSW, the Planning Portal explains that a change of use may be exempt development where the requirements are met. In Queensland, your council and building certifier confirm the pathway for your site.

  3. Expect the certifier’s usual flags. An NSW BCA assessment report for a warehouse development shows the typical items: fire separation of electrical equipment, building population for egress and sanitary facilities, stair and balustrade details, access provisions, fire services, ventilation and an energy compliance report.

  4. Design for safety. The Western Australian Government’s fitout design brief notes that the model WHS laws require designers to ensure, so far as reasonably practicable, that structures are designed without risk to those who build, fit out, use and maintain them.

 

From brief to completion: the steps

 

  1. Define the brief. Headcount, visitors, noise sensitivity, growth over five years, and whether the office will include a showroom, meeting room or function space.

  2. Assess the building. Slab, clear height, columns, existing services, fire compartments and the approved use. This tells you whether a mezzanine is feasible and what the classification will be.

  3. Test the layout against the 10% rule. Settle area, zones and the relationship to forklift routes.

  4. Develop the design. Acoustic envelope, lighting, air-conditioning, access path, amenities and finishes, drawn so a builder can price them.

  5. Document for approval. Plans, structural and fire inputs and the certifier’s checklist.

  6. Build and close out. Inspections, certification and handover.

 

Steps 2 to 5 are where a designer earns their fee. At Formardå, building approval management and detailed documentation are part of what we do, and we pair creative design with practical construction knowledge. Our studio has worked on commercial and industrial spaces in Brisbane since 2009, including an industrial function space.

 

Designing a warehouse office with Formardå

 

If you are planning an office in a Brisbane warehouse, we can take you from the first layout through to approval documentation. Our fit out design service covers commercial interiors, and our commercial projects work covers the building side, so the classification, structure and fit-out are resolved together instead of in separate hand-offs.


Formarda

Bring your lease or title details, your headcount and a rough idea of how you work, and we will tell you what the site can take.

 

FAQ

 

Can you turn part of a warehouse into an office?

 

Yes, in most cases. The key checks are the building’s approved use, the NCC classification of the new office and whether the work needs a building permit or planning approval. Your building certifier confirms the pathway for your site.

 

How big can a warehouse office be before the classification changes?

 

Under the NCC, a different-purpose part of a storey that is no more than 10% of that storey’s floor area may adopt the main classification, subject to limitations. An office at 8% of the floor can stay within Class 7b, while one at 12% is classified separately as Class 5.

 

How much light does a warehouse office need?

 

The ACT code, based on AS/NZS 1680.1:2006, recommends 320 to 400 lux for routine office tasks such as reading and typing, and 240 lux for ordinary tasks including computer use. Loading bays and canteens sit at 160 lux, so the office needs its own lighting design.

 

How much does a warehouse office fitout cost?

 

Going Rate’s November 2026 data puts office and amenities space at $1,200 to $2,000 per m². For a 1,000 m² unit with a 100 m² office, it gives $250,000 to $450,000 all up. Your figure depends on structure, finishes and services.

 

Sources

 

Recommended

 

 

 
 
 

Comments


bottom of page