Renovation Plans: How to Plan a Brisbane Renovation

Writer: Andrew Lynch
Andrew Lynch
3 days ago
10 min read

Homeowner measuring an existing Brisbane room

Good renovation plans do three jobs at once: they fix how the house works for the way you live, they stay inside a budget you set before any drawing begins, and they give the council and the builder documents they can approve and price. A licensed building designer who knows Brisbane’s regulations can carry all three through together, which is why we at Formardå start every renovation with the layout and the approval pathway side by side, not one after the other.

 

This guide walks through the plan from the first look at your existing house to the drawings a builder quotes from. It is written for Brisbane homeowners, and for business owners and venue operators planning a renovation of their own premises.



TL;DR

 

  • Start with how the house functions today: which rooms you use, which you avoid, and why. Then measure everything before anyone draws a change.

  • Redesign the layout with scaled furniture and a written storage list, not by moving walls on instinct.

  • Set a budget cap for each stage and keep a contingency, because early builder estimates rarely fall and often rise.

  • Minor internal changes may not need approval, but structural, plumbing and larger changes usually do. In Queensland, renovations needing building approval must also meet energy requirements.

  • A designer who handles layout, documentation and approvals together keeps the plans consistent from concept to council.

 

Table of Contents

 

 

What renovation plans actually need to achieve

 

People search for renovation plans expecting a floor plan. A floor plan is only one page of a set. The full plans are the drawings and specifications that let a council assessor or private certifier approve the work and a builder price it without guessing.

 

Before that set exists, the plan is a decision about purpose. YourHome, the Australian Government’s guide to sustainable home design, advises starting with how the home functions and how it could better suit your lifestyle and thermal comfort. In other words: what is wrong with the house, not what would look good in a magazine.

 

A renovation plan that works answers these questions:

 

  • Which rooms are in the wrong place, or too hot, too cold or too noisy?

  • Where do you need more space, more storage or more light?

  • Which parts of the house are sound and worth keeping?

  • What will the work cost, and what happens if you have to do it in stages?

 

Assess your existing house first

 

YourHome recommends a simple SWOT analysis (strengths, weaknesses, opportunities, threats) of the existing house. Keep what works. List the weaknesses, such as a bedroom that overheats or a kitchen cut off from the living area. Then note the opportunities: more storage, rooms that could be combined or divided, better winter sun and summer breezes. Record any repairs or structural problems at the same time.

 

Its preliminary research guidance turns this into practical questions:

 

  • Which rooms do you use a lot, and how could they work better?

  • Which rooms are rarely used, and why? Common reasons are heat, cold, noise or no space for furniture.

  • How much space do you actually need?

  • What storage is required, for example tall cupboards or multiple shelves?

  • Could compatible rooms be combined (kitchen and living) or separated (living and bedrooms)?

 

Write the answers down. They become your brief, the document a designer works from.

 

Measure before you draw

 

Archicentre Australia, cited by YourHome, says to measure the existing house in metres and millimetres before developed drawings are prepared. That means room dimensions, window heights, service locations, ceiling heights, door swings and the roofline. These go onto an existing conditions plan, drawn at 1:100 or 1:50 scale.

 

This is where a lot of home-drawn plans go wrong. A wall that looks removable may carry roof load, and a bathroom that looks easy to move may sit directly over a drain. An accurate existing conditions plan shows these constraints before you fall in love with a layout that cannot be built. In Brisbane, older timber houses add their own surprises, such as lowset additions that have been stacked on over decades and uneven floor levels. Our Queenslander renovation guide covers those in detail.

 

Redesigning the layout: a worked approach

 

Redesigning a house layout is a problem of movement, light and privacy. Work through it in this order.

 

  1. Fix the problem rooms first. If the kitchen is dark and closed off, the solution may be opening the back of the house, not enlarging the kitchen.

  2. Test with real furniture. YourHome suggests asking your designer for scaled drawings of the furniture you plan to use, printed and cut out, so you can try arrangements on the concept plans. A queen bed plus two bedside tables in a 3 by 3 metre room tells you more than any rendering.

  3. Write a detailed storage list. Count what you own and what you need within reach of where it is used. Storage designed late is the first thing squeezed out of a plan.

  4. Think about the roof. Archicentre Australia cautions that many floor plans produce an unacceptable maze of rooflines and ridges. A layout that looks neat on paper can create valleys, leaks and cost on top of the house.

  5. Trim, don’t just add. YourHome notes that saving a few square metres from each room can free enough budget to pay for double glazing or a solar array. Smaller, better-planned rooms often beat a larger house with the same money.

 

A real example of re-planning

 

A YourHome case study in Fitzroy North, Victoria shows the principle. The original ground-floor kitchen became a bathroom, the living room stayed largely untouched, and the back of the house was opened and extended into a new kitchen and dining area. The result gained light and space, and the whole second storey was retained. The lesson is that moving functions between rooms can achieve more than adding floor area.

 

Plan ideas for common needs

 

A better kitchen

 

YourHome’s kitchen guidance covers the details that are easy to miss at concept stage:

 

  • Consider traffic flow and safety, especially where the kitchen meets the living space.

  • Keep the fridge well ventilated and away from the oven or other heat sources.

  • Choose energy- and water-efficient appliances.

  • Consider reusing the existing joinery carcass with new cupboard fronts.

  • Use low- or no-VOC materials with E0 or better finishes, and durable finishes that will not date.

  • Include space for composting and recycling.

 

Storage

 

Purpose-built storage suits awkward spaces better than freestanding furniture. YourHome suggests low-VOC laminates or veneers, and specifying Global GreenTag or FSC certified timber veneers.

 

Bathrooms and accessibility

 

If you plan to stay in the house long term, build in flexibility now. YourHome’s liveable and adaptable home guidance includes at least one toilet on the ground or entry level, showers without hobs, nonslip surfaces, task lighting, easy and safe storage, and reinforced stud walls so grab rails can be fitted later. Adding reinforcement while the walls are open costs little. Retrofitting it later costs far more.


Level-entry shower in an accessible home bathroom

The order of a renovation

 

YourHome sets out four stages, and the plans sit at the heart of the first two.

 

Stage

What happens

Who is involved

1. Assessment and design

Brief, concept design, design development, construction documentation

Designer or architect, energy assessor if needed

2. Approvals

Council or private certifier process

Designer or builder can assist

3. Building

Construction, with licensed trades for plumbing, gas and electrical

Builder and licensed trades

4. Certification

Inspection of the completed work before final certification

Council building inspector or registered private certifier

The design stage has its own sub-steps. According to YourHome’s designing a home guidance, it runs from brief to concept designs, then design development, then construction documentation. At design development the plans show preliminary room arrangements, window sizes and orientation, indoor and outdoor flow, and furniture layouts. This is also the stage where it is common to discuss the proposal with council planners and inspectors and with one or two likely builders, to check buildability and budget.

 

That pre-consultation is the step most owners skip. Showing a builder a concept plan before it is final is cheaper than discovering at quote stage that the design needs a steel beam you never budgeted for. Our design process page sets out how we work through these stages.

 

Approvals: what Brisbane renovations usually need

 

YourHome explains that most local governments allow minor internal and external changes that do not alter the structure or services without council approval. Changes to services (plumbing, drainage, gas, electrical) need approval and inspection by the relevant authority. Larger changes and additions will most likely need development approval.

 

In practice, the line between minor and approvable is not always obvious. Removing a non-loadbearing partition is different from removing a wall that supports a roof. Raising a Queenslander, building under it or extending toward a boundary can trigger Brisbane City Council planning requirements as well as building approval. Our guide on whether you need council approval in Brisbane explains the common cases, and we can also help with DA approvals where a development application is required.

 

Energy requirements in Queensland

 

If your renovation needs building development approval, energy rules apply. The Queensland Development Code’s MP 4.1 Sustainable Buildings (version 1.15, commenced 1 May 2024) applies to renovation of a class 1 building, which is a standard house, and the code defines renovation as any alteration or addition needing building development approval. A class 1 building is deemed compliant if it meets the 2019 National Construction Code requirements in 3.12.0(a)(ii) plus a 1-star nominal credit, which is equivalent to a 7-star NatHERS rating. NatHERS is the national scheme that rates a home’s thermal performance from 0 to 10 stars.

 

Separately, Queensland adopted NCC 2022 on 1 May 2024 with a 12-month transition period. For new residential work it requires 7-star NatHERS and a Whole of Home score of 60 or more, though the Whole of Home requirement generally does not extend to renovations of existing homes unless a jurisdiction has broadened it. Your designer should confirm which pathway applies to your project before drawings are finalised, because insulation, glazing and orientation choices flow straight from it.


Energy requirements in Queensland

Budget: what drives cost in the plans

 

YourHome lists the main cost variables, and each one is something the plans can influence:

 

  • Size. Designers work within cost-per-square-metre ranges.

  • Preliminaries. Council, geotechnical and engineering fees.

  • Site difficulty. Slope, access, fire hazard and wind exposure.

  • Construction system. Timber, masonry, steel or a mix.

  • Wet areas. The number and size of bathrooms, laundry and kitchen.

  • Services. Water, sewer and energy supply.

  • Access. Driveway construction, materials transport and trade travel times.

 

Designers provide an opinion of probable cost, but they do not accept responsibility for the final cost. Use that figure to test the brief early. Archicentre Australia advises estimating approximate cost by multiplying area by average building cost before settling the size and orientation of the renovation. That can lead to a reduced scale or a staged approach, which is far easier to adopt on paper than halfway through construction.

 

Protecting the budget

 

YourHome warns that builders’ preliminary estimates rarely come down and often rise. Its advice is to:

 

  • Set aside a contingency.

  • Agree a budget cap for each stage, fully invoiced at that stage.

  • Negotiate variations and overruns as they occur, not defer them.

  • Quarantine sustainable features in the budget so late cost overruns do not consume them.

 

Changes after building starts should be recorded in the contract, since they can be expensive and cause delays. YourHome also encourages treating cost as a design input: review the preliminary budget against the brief to find problems early, and ask for indicative costs for each sustainable feature, weighed over their lifetime in energy and water savings.

 

Do not forget what happens outside the walls once the builders leave. Planning the ongoing upkeep of the yard is part of the budget too, and it helps to understand what drives garden maintenance costs before a larger landscaped area gets added to the plans.

 

Common planning mistakes

 

Most expensive renovation mistakes are made on paper, before a trade arrives.

 

  • Starting with finishes, not function. Tapware is chosen before anyone has asked whether the bathroom is in the right place.

  • Skipping the measure-up. Plans drawn from old or guessed dimensions lead to variations.

  • Ignoring the roof. An addition that creates a tangle of ridges and valleys adds cost and risk.

  • No contingency. A fully committed budget has no room for what is behind the walls.

  • Leaving approvals to the end. A design that fails a planning or energy requirement has to be redrawn.

  • Informal changes during the build. Anything not recorded in the contract is open to dispute.

 

Who should prepare your plans

 

You can sketch your ideas, and you should: a marked-up floor plan with notes on what you want is the most useful thing to bring to a designer. The formal plans are another matter. They must carry structural and compliance detail that a council or certifier will accept, and a builder will price from.

 

Formardå is a Brisbane building design and drafting studio led by licensed designer Andrew Lynch, operating since 2009. Our approach blends creative design with practical construction knowledge, so the layouts we propose are drawn with buildability and compliance in mind. For renovations and extensions we cover design, documentation and building approval management, so the same people who shape your layout also prepare it for approval. If you are weighing the options, our page on building designer versus architect explains the difference.

 

Start your renovation plans with Formardå

 

Our renovations and extensions service is for Brisbane homeowners who want a layout that suits how they live and plans that move cleanly through approval. We also offer design consultations and drafting, listed on our services page, and you can see finished work in our Albion renovation.


Formarda

Bring your brief, your measurements if you have them, and a list of what frustrates you about the house today. That is enough to begin.

 

FAQ

 

In what order should you do a renovation?

 

Assessment and design come first, then approvals, then building, then certification, as set out by YourHome. Within design, work through the brief, concept designs, design development and construction documentation. Pricing and builder input belong at design development, before the plans are final.

 

Do I need council approval for renovation plans in Brisbane?

 

Minor internal and external changes that do not alter structure or services often do not. Changes to plumbing, drainage, gas or electrical services need approval and inspection, and larger changes and additions will most likely need development approval. The safest step is to have your designer check your specific house before you commit to a layout.

 

How do I redesign a house layout without wasting space?

 

Begin with a written list of which rooms you use, which you avoid and how much storage you need. Test the layout with scaled cut-outs of your actual furniture on the concept plan. Consider combining rooms that suit each other, such as kitchen and living, and separating those that do not, such as living and bedrooms.

 

How much contingency should I allow?

 

YourHome does not give a percentage, but it advises always setting budget aside for contingencies and agreeing a cap for each stage. Builders’ preliminary estimates rarely fall and often rise. Ask your designer for an opinion of probable cost early, and review it against your brief.

 